Gunn Memorial Library

Geothermal Retrofit Project

 

 

This page and links are a guide to the Library Committee

See Gmail correspondence as well.

 

Peter Tavino's required CPA for the CT Clean Energy Fund

Customer Purchase Agreement  3/31/11

 

 

Orange Flags placed to depict where boreholes would be drilled. See Plan Image below.

 

Image from the GeoSolutions Report of 4/8/11 (Software will be updated and republished.)

 

Geothermal loop pipe would enter foundation on either side of the red tank below.

 

Red pump (one of two) on right circulates water to 15 existing ClimateMaster heat pumps in operation.

 

Climate Master Inventory  4/19/11 (print to read pending rotation edit)

 

Plan to determine performance and efficiency of each existing heat pump

by completing 15 VIP forms here with Jeff of Olsen Service Co. on 5/10

http://www.cl-p.com/Home/SaveEnergy/Rebates/VIP_Closed_Loop_Worksheet.xls

 

Geothermal Agenda and Report 4/20/11

 

 

46 meg As Built Plans available, but not uploaded here.

 

 

Energy Audit Status  4/26/11

 

 

Energy Audit proposal by Peter Harding  4/27/11

 

Peter Tavino's superseded account of the

Energy Audit conducted by Peter Harding 5/4/11

 

ENERGY AUDIT REPORT by Peter Harding  5/6

 

ENERGY AUDIT 3meg IMAGES by Peter Harding 5/6

 

 

Load Calculation Proposal by Sage Engineering  4/27/11

 

Prevailing Wage forms if CCEF rebate is pursued:  5/5/11

http://www.ctdol.state.ct.us/wgwkstnd/prevailing-rates/PrevailingWageGuide/payrollcert1.pdf

Rates being pursued beyond this: http://www.ctdol.state.ct.us/wgwkstnd/prevailing-rates/rates.htm

Litchfield County rates pdf  from Neil at CCEF: 5/6/11

(Well driller's rate must be secured from George in Accounting)

 

 

Geothermal Heat Pump Commercial - As of 4/30/2011

 

Applications Received

Rebate Funds Reserved

Rebate Funds Remaining

% Remaining
23
 $1,702,338
 $547,663
 24.3%

 

Program Start

Program End Months Left in Program

%

 December 2009
April 2012  12
 41%

 

34 page form to be completed: 5/5/11

http://www.ctcleanenergy.com/Portals/0/CCEF-GT-001%20Application%20+%20Terms%20Comml%2011-24-10.doc

 

 

 

Preliminary Project Budget and Schedule per CCEF Form

 

Project Schedule

Date (expressed in # of months after contract signing)

Expected Calendar

Date

Execution of project contract

1

6/10/11

Site design complete

1

 

Commencement of construction

2

 

Start of operation (system commissioning)

3

9/10/11

 

 

Total Project Budget

(include direct labor in all costs)

Projected Cost - $

Total labor hours estimated for project

300

hours

Heat pump(s)

$30,000

Ground loop, including piping and grouting

$57,600

Interior ductwork (if new) or upgrades

$15,000

Site engineering, design, and permitting

$9,000

Total: 

$ 111,600.00

Incentive amount requested from CCEF

$21,000

 

 

 

 

Please direct questions and comments to PeterTavino@gmail.com

Information is to remain confidential with client pending fair bidding process.

 

 

Web site Updates after initial May 2, 2011 publication:

 

                                                      

Description     Publish date
Energy Audit page added 5/4/11
Prevailing wage links added, CCEF remaining funds available table, link to 34 page application form. Added VIP form link. 5/5

Litchfield County wage rates.

Received and published Peter Harding's Report and Images pdfs.