Orange Flags placed to depict where boreholes would be drilled. See Plan Image below.
Image from the GeoSolutions Report of 4/8/11 (Software will be updated and republished.)
Geothermal loop pipe would enter foundation on either side of the red tank below.
Red pump (one of two) on right circulates water to 15 existing ClimateMaster heat pumps in operation.
Climate Master Inventory 4/19/11
(print to read pending rotation edit)
Plan to determine performance and efficiency of each existing heat pump
by completing 15 VIP forms here with Jeff of Olsen Service Co. on 5/10
http://www.cl-p.com/Home/SaveEnergy/Rebates/VIP_Closed_Loop_Worksheet.xls
Geothermal Agenda and Report 4/20/11
46 meg As Built Plans available, but not uploaded here.
Energy Audit Status 4/26/11
Energy Audit proposal by Peter Harding 4/27/11
Peter Tavino's superseded account of the
Energy Audit conducted by Peter Harding 5/4/11
ENERGY AUDIT REPORT by Peter Harding 5/6
ENERGY AUDIT 3meg IMAGES by Peter Harding 5/6
Load Calculation Proposal by Sage Engineering 4/27/11
Prevailing Wage forms if CCEF rebate is pursued: 5/5/11
http://www.ctdol.state.ct.us/wgwkstnd/prevailing-rates/PrevailingWageGuide/payrollcert1.pdf
Rates being pursued beyond this: http://www.ctdol.state.ct.us/wgwkstnd/prevailing-rates/rates.htm
Litchfield County rates pdf from Neil at CCEF: 5/6/11
(Well driller's rate must be secured from George in Accounting)
Geothermal Heat Pump Commercial - As of 4/30/2011
Applications Received |
Rebate Funds Reserved |
Rebate Funds Remaining |
% Remaining |
23
|
$1,702,338 |
$547,663
|
24.3% |
Program Start |
Program End | Months Left in Program |
% |
December
2009
|
April 2012 | 12 |
41%
|
34 page form to be completed: 5/5/11
http://www.ctcleanenergy.com/Portals/0/CCEF-GT-001%20Application%20+%20Terms%20Comml%2011-24-10.doc
Project Schedule |
Date (expressed in # of months after contract signing) |
Expected Calendar Date |
Execution of project contract |
1 |
6/10/11 |
Site design complete |
1 |
|
Commencement of construction |
2 |
|
Start of operation (system commissioning) |
3 |
9/10/11 |
Total Project Budget (include direct labor in all costs) |
Projected Cost - $ |
|
Total labor hours estimated for project |
300 |
hours |
Heat pump(s) |
$30,000 |
|
Ground loop, including piping and grouting |
$57,600 |
|
Interior ductwork (if new) or upgrades |
$15,000 |
|
Site engineering, design, and permitting |
$9,000 |
|
Total: |
$ 111,600.00 |
|
$21,000 |
Please direct questions and comments to PeterTavino@gmail.com
Information is to remain confidential with client pending fair bidding process.
Web site Updates after initial May 2, 2011 publication:
Description | Publish date |
Energy Audit page added | 5/4/11 |
Prevailing wage links added, CCEF remaining funds available table, link to 34 page application form. Added VIP form link. | 5/5 |
Litchfield County wage rates. Received and published Peter Harding's Report and Images pdfs. |
5/6 |